The estimation calculations were to be continuously up-dated until the tender period so that any modifications can be immediately evaluated
Heating, Air-conditioning, Cooling, Sanitary, Regulation
Preliminary design
Draft design
Design for permission
Detailed design
Preparation and assistance within the contracting
Approval for installation design
Construction supervision
Taking-over
Defects liability period supervision