Service centre Campus Krems

Task definition
  • Construction of Hotels with 91 rooms and restaurant, education facilities Danube-University, Offices, Wellness area, Restaurant, Cafe und Hairdresser
  • It was required to investigate several variants of building technology for two different construction methods (Passive, construction regulation) from the cost-effectiveness point of view.
  • The system was to be designed as simple as possible in order to keep the investment and operation costs in a scheduled budget.
  • The estimation calculations were to be continuously up-dated until the tender period so that any modifications can be immediately evaluated

Solution
  • Automated interconnection between design and calculation of investment and operation costs
  • Variety of exactly dimensioned preferably centralized facilities
  • Regulation possibilities for heating, cooling and ventilation in all rent-rooms
  • Design of roofs as retention area so that the newly constructed sewer connection does not get overloaded
  • Automated connection between proposal and design data in order to be able to evaluate any possible design changes

Services
  • Heating, Air-conditioning, Cooling, Sanitary, Regulation

  • Preliminary design

  • Draft design

  • Design for permission

  • Detailed design

  • Preparation and assistance within the contracting

  • Approval for installation design

  • Construction supervision

  • Taking-over

  • Defects liability period supervision


Facts
  • Client: Rhomberg Bau GmbH
  • Net area: approx. 7000 m²
  • Project period: 2007 - 2008
  • Total budget: € 10.000.000,–