Hydro Ingenieure - Vision to clear solutions

Land exposition Time travel Heldenberg

Tasks definition
  • Complete rehabilitation of Radetzky-Gedenkstätte am Heldenberg (historic monument)
  • Construction of underground museum hall
  • Extension of drinking water supply for new underground museum hall
  • Construction of new trafo-station for the museum monument
  • Light wave conductor municipality office – museum hall, length 1,2 km
Solution
  • Flexible lightning solution (conductor bars) in all exhibition areas
  • Integration of conductor bars into the concrete top slabs of the museum hall
  • Ventilation equipment in the underground museum hall controlled by moist, odour and temperature sensors
  • Emergency lightning with central battery facility
  • Central delivery air treatment in culture depot
  • PVC-free cabling

Services
  • Ventilation, sanitation, complete LV and HV connections
  • Preliminary design
  • Draft design
  • Design for permission
  • Detail design
  • Preparation and assistance within the contracting
  • Approval for installation design
  • Construction supervision
  • Taking-over

Facts
  • Client: Municipality Heldenberg
  • Gross area: approx. 850 m²
  • Project period: 2004 - 2005
  • Budget-TGA: € 220.000,–
  • Contact person: Andreas Biegler, BSc