Hydro Ingenieure - Vision to clear solutions

Land police headquarters and culture warehouse

Tasks definition
  • Construction of two buildings including laboratory rooms for land police headquarters Lower Austria and a warehouse for culture department of land government Lower Austria.
  • The office-building was to be constructed complying with low energy demand standards.
  • Protection of culture valuables against temperature and moisture fluctuations

Solution
  • High quality measurement, control and regulation technology for exact compliance and documentation of room climate conditions.
  • Lighting control depending on daily light - in land police headquarters
  • Alarm device, access control, video supervision facility assembled together in central building management system
  • Concrete core activation of outer walls for thermal shield of warehouse and archive
  • Cooling equipment with waste heat recovery for water and regular heating.
  • Emergency lighting in LED-Technology
  • Central delivery air in culture warehouse
  • PVC-free cabling

Services
  • Heating, ventilation, cooling, sanitation, complete LV and HV connections, safety technology, rain water irrigation
  • Preliminary design
  • Draft design
  • Design for permission
  • Detailed design
  • Preparation and assistance within the contracting
  • Approval for installation design
Facts
  • Client: Architect Dipl.-Ing. Ernst Maurer
  • Gross area: Office building approx. 13.000 m², Culture warehouse approx. 12.000 m²
  • Project period: 2006 - 2009
  • Total budget: € 36.000.000,–
  • Contact person: Andreas Biegler, BSc